Fiber Optic Connection Upgrade
An electric utility client replaced a leased line connection with a fiber optic connection.
Fiber Optic Connection Upgrade Read More »
An electric utility client replaced a leased line connection with a fiber optic connection.
Fiber Optic Connection Upgrade Read More »
Mesa’s Power Delivery Transmission & Distribution team provided engineering and design services required for a major electric company’s 69 kV transmission line rebuild in the mountains of the Southeastern United States.
69kV Transmission Line Rebuild Read More »
A major Utility Client constructed a 63,000 square foot warehouse as they were in need of a central location for storage of turbine/generator rotors, motors, and stators for their facilities. Working within an extremely aggressive schedule, Mesa provided engineering and design services as well as, specifications for procurement of the new metal building and 250-ton gantry crane.
A major power utility company installed a new distribution station with one 100/12.5kV bank and four distribution circuit exits.
Relay Settings Project Read More »
A large electric utility company installed Anhydrous Ammonia detection transmitters at their coal-fired facility in North Carolina.
Anhydrous Ammonia Detection Transmitters Read More »
Mesa was contracted to review the adequacy of a Utility District’s fire protection capabilities and make recommendations for upgrades to meet the current NFPA codes at their facility that is in a remote area with significant response times for emergency personnel.
Fire Protection Services Read More »
A major electric utility company is rebuilding 20.17 miles of their 69kV line assets. Mesa is providing engineering and design services for the rebuild.
138kV Line Rebuild Read More »
Mesa’s Power Generation group was contracted by a large electric utility company to support the installation of a Hydrated Lime Injection System (HLI) for a 924 MW coal-fired electric generating facility located in Florida.
Hydrated Lime Injection System Read More »
An animal and livestock nutrition supplier installed a new 800kW Combined Heat and Power (CHP) system to reduce operating costs, provide higher efficiencies for steam production, as well as offer a way to deliver consistent, reliable power around the clock as well as emergency power.
Combined Heat And Power System Read More »
Mesa was contracted by a large Southeastern power utility to act as Responsible Engineer for a phase reversal switch replacement project at a 1,616 MW pumped storage plant.
Phase Reversal Switch Replacement Read More »