2019 Fantasy Of Trees
East Tennessee Children’s Hospital hosted another very successful Fantasy of Trees Christmas Spectacular!
2019 Fantasy Of Trees Read More »
East Tennessee Children’s Hospital hosted another very successful Fantasy of Trees Christmas Spectacular!
2019 Fantasy Of Trees Read More »
Mesa’s Knoxville, TN Associates continue the annual miracle of providing gifts, filling wishes, and bringing hope to the needy children in their local community.
Knoxville Associates Give this Christmas Read More »
Mesa provided engineering design services and detailed specifications for the replacement of an existing 2 ton, pneumatic hoist that presented the station with safety, reliability, and environmental concerns.
Hydro Plant Trash Rake Replacement Read More »
PHOTOS: Mesa Associates Inc. makes green changes
Mesa Associates Inc. makes green changes Read More »
There are five turbines installed in Mansfield, CT. This site is an independently owned hydropower generation facility. It houses five NuTURBINE LR-100’s, sized with 100 kW generators for a maximum total output capacity of 500kW. The site has approximately 17 ft of head and 450 cfs of flow. The choice of five 100 kW hydroturbines rather than fewer >100 kW turbines was based on using the optimal capability of the variations of the river to generate energy.
Installed Projects: Mansfield, CT Read More »
The NuTURBINE LR-100 was installed in a small site in Massachusetts. A singular NuTURBINE using a 100 kW generator was installed in 2014. This installation has in-excess of twenty- five thousand (25,000) operational hours.
Installed Projects: Massachusetts Read More »