About PMO
Jeff Keller, PE, PMP discusses how PMO at Mesa can pull together other groups and take it from the strategic level down to actionable series of portfolios, programs, and projects.
Jeff Keller, PE, PMP discusses how PMO at Mesa can pull together other groups and take it from the strategic level down to actionable series of portfolios, programs, and projects.
This video is an introduction to the PMO team and provides a brief insight into what each team member do for Mesa. Jeff Keller, PE, PMP is the Director of PMO. Shanna Bullock, PMP, is a Project Manager in Quality. Eli Schott is a Program Manage for Power Deliver Substation (PDS). Nick Fox, PE, PMO is a Program Manager. Larry Blair is a Senior Project Manager. Tim Rauch, PE, is a Senior Program Manager.
Get to Know the PMO Team Read More »
Mesa Associates, Inc. was recently awarded a five-year contract to perform substation and transmission design services for a major utility in the southeast.
Mesa Awarded Five-Year Substation And Transmission Design Contract Read More »
Jeff Keller, Director of PMO, explains what PMO is at Mesa and how it is more about the organization than just project management.
Introduction to PMO Read More »
This year the 2021 Fantasy of Trees raised more than $450,000 to help treat our area’s children at East Tennessee Children’s Hospital. This is a new record that would not have been possible without the donations from companies such as Mesa.
2021 Fantasy Of Trees Read More »
Mesa provided engineering and design services required to install 9.3 miles of Optical Ground Wire (OPGW) between a large utility client’s new OPGW splice cases.
Optical Ground Wire Project Read More »
Mesa is using Drone Based Lidar with Machine Learning to locate encroachments to save time and money by quickly and specifically identifying problem areas.
TVPPA E&O Conference – Drone Presentation Read More »
A North Carolina coal-fired steam plant needed to find a reliable solution to mitigate dust migration at a site complex, as they were having issues associated with fugitive dusting from a gypsum stockpile.
Gypsum Stockpile Building Read More »
Mesa provided multi discipline engineering and design services to support a new 60 foot high experimental beamline facility to house technically specialized equipment with a 20-foot-deep basement adjacent to several existing buildings for a government client.
60 Foot High Beamline Facility Read More »
Hurricane Sally caused a 20-foot storm surge which flooded and damaged a large utility company’s basement elevation encompassing a large amount of electrical equipment beyond repair.