Substations & Switchyard
Electrical High Voltage Experience
500 kV Substation Experience
- Last ten years over 200 projects at 500kV substations
- Developed Independent Pole Operation (IPO) Standard for TVA
- Example One: Completed 500kV switching station connecting 6 CTs to the 500kV grid
- Example Two: Converted 500kV yard from a main and transfer bus to a double breaker configuration
Physical Design
- Our Physical Design Group develops the following types of engineering documents:
- Electrical Equipment General Arrangements for the Switchyards and Substations
- Site Grading and Drainage
- Structures/Foundations
- Oil Containment Design
- Equipment Plans, Elevations, and Sections
- Control House Layout
- Grounding Studies
- Conduit/Grounding Drawings
- Bills of Material
- Cable Schedules
Protection Schemes
Commonly used protection schemes:
- Bus Differential
- Bank Differential
- Line Differential
- Over-current protection
- Over/Under Voltage protection
- Over/Under frequency and load-shedding protection
- Distance Protection
- Directional Protection
- Pilot Relaying Protection
- Breaker Failure Protection
- Capacitor Bank Protection
Protection & Control Design
Our Protection & Control Design Group develops the following types of engineering documents:
- Single Line Diagrams
- Three Line Diagrams
- Panel Front Views
- Elementary Diagrams (AC & DC)
- Equipment & Switchboard
Wiring Diagrams
- Nameplates and Wiring Tags
- Isolation & Restoration Work Plans
- Detailed Work Descriptions
- Battery Studies
- Bills of Materials
Telecommunication Design
Our Telecommunication Design Group is responsible for communications between Substations/ Switchyards, including:
- Digital Microwave Radio
- Power Line Carrier Relaying
- Fiber Optic Transport Systems
- UHF/VHF Radio
- GPS Radio
- Spread Spectrum Radio
- Cellular Phone - Radio Frequency Electromagnetic Field Measurement
- Wide Area Ethernet
- Battery & Charger Systems
- High Voltage Protection for Telephone Lines
- Telemetering
- Telephone Systems
Our Telecommunication Design Group develops the following types of engineering documents:
- Single Line
- Connection Diagrams
- Jumper & Cable Diagrams
- Line-to-set Connection Diagrams
- Panel Arrangement
- Bill of Material
- Cable Schedules/Indices
Relay Settings & Programming
SEL Relays:
- 121
- 221
- 287
- 287V
- 311B
- 311C
- 311L
- 321
- 351
- 351S
|
- 351R
- 387
- 421
- 501
- 551
- 587
- 587Z
- 2020
- 2030
|
ABB Relays:
Areva Relays (formerly GEC):
- Optimho
- LFZP114
- MCGG22
- MBCH
- MFAC
|
GE Relays:
- F30
- F35
- F60
- B60
- D60
- T60
- IAC
- GCX
- GCY
- JBCG
|
Oil Containment Experience
Phase 1 Study:
- Station Evaluation
- Spill Prevention Control and Countermeasure (SPCC) Plan
Phase 2 Detailed Design:
- Containment & Diversionary Structures
- Storage
Phase 3 Implementation:
- Remediation
- Construction
- Construction Management
- Procedures
- Inspection
- Maintenance
- Operation
- Training
Transmission & Distribution
- Experienced in Transmission-to-transmission Design
- Experienced in Transmission-to-distribution Design
- Performed Independent Review of a Major Utility’s Transmission to Distribution P&C Standard
- Distribution Clients
- Alabama Power
- E ON.US
- Knoxville Utilities Board
- Progress Energy Florida
- Transmission Clients
- Progress Energy Carolina (PEC)
- Progress Energy Florida (PEF)
- Southern Co. (APCO, Gulf Power, Mississippi Power)
- TVA
System Planning, Studies, & Analysis
- Load Flow Analysis
- Short Circuit Analysis
- Load Growth Projections
- Economic Best Practices
- Grounding Analysis
- Software Experience
- Etap, Milsoft’s Light Table & Windmill, Aspin, CAPE, CDEGS
SCADA Design and Programming
- Siemens, Telvent, and Advanced Control Systems RTUs and controllers
- Integration with relays, breakers, metering, other SCADA systems
- Approximately 50 RTU configurations per year, last four years
- Previously, Mesa was the sole provider of RTU configurations for all TVA contracted RTU designs
Electrical Panel Fabrication
- Relay Panel Fabrication
- SCADA Panels Fabrication
- Instrument Tag Engineering Service
- Complete Documentation
- Installation/Start-up Assistance
- Procurement Services
Substations & Switchyards Experience
- Over 120 Professional, Technical, and Administrative Employees
- 24 Registered Professional Engineers working in the Electrical Division
- Over 2000 years of substation and switchyard experience
2000 years can be broken down as follows:
- 40 years of TPS Planning Experience
- 1475 years of Design Experience
- 325 years of Communications
- 110 years of Field Testing and Construction
- 90 years of Operations Experience
- Completed over 2000 substation design projects over the last 12 years.
Types of Projects
- Breaker Replacement
- Line Relay Replacement
- “Greenfield” Station
- Transformer Bank Replacement/Addition
- Metering Upgrades
- Capacitor Bank
- Reactor Bank
|
|
Engineering & Design
|
Energy
|
Panel Fabrication
|
Machine Building
|
Industrial
|
|
|
|